Odysseus
Part VI ยท A worked application
Chapter 24

A fund's weekly work: the review, the figures and the sums

How to sort a firm's recurring work into comparisons, reading and procedure: a pipeline review made by code from the database's own layout, companies' reported figures kept as numbers, round maths taken away from the model, and procedures shipped as skills the owner can replace.

After this chapter you should be able to
  • Sort the recurring work of an investment firm into what is a comparison of dates or numbers, what is reading, and what is a procedure, and give each to code, to the model, or to a skill.
  • Build a weekly review of a pipeline from a database's own layout, with no model call and no object or stage named in the code.
  • Keep figures that companies report as numbers only, and say why that is a safety property as well as a tidy one.
  • Take arithmetic away from the model by giving it a calculator with stated conventions.
  • Ship procedures with a program in the same form the owner teaches their own, so that the owner's always wins.
This unit
Week
13 of 14
Before it
Chapter 5, Chapter 9 and Chapter 21; Definitions 1, 2, 5 and 8 of the model.
Read first
[Anthropic 2024a]; [Sumers et al. 2023].
Laboratory
None; these units feed the project
Problem set
None; assessed through the project

24.1The problem

A partner at an investment firm does a handful of things every week that nobody would call judgement. Before the Monday meeting they go down the pipeline looking for deals nobody has touched, next steps whose date has passed, and founders who wrote and were not answered. When a company they invested in sends its monthly update, they mean to compare it with last month's. When a term sheet arrives they work out what the round does to everybody's share. They write the same kinds of document again and again: a memo on a deal, a note letting a founder down, a pack for the partners, a first reading of a data room.

An assistant with a model and tools could be asked to do each of these from scratch each time. It would cost a model's time, the answer would vary from week to week, and in two of the cases (the dates and the sums) it would sometimes be wrong while sounding right. This chapter sorts the work by what it is made of, and gives each kind to whatever does it reliably.

24.2Three kinds of work

The work isExampleWho does itWhy
A comparison of dates or numbersWhich deals have gone quiet; what a 10% option pool costs the foundersCodeIt is the same question every time, it has one right answer, and code gives that answer for nothing
ReadingFinding "revenue was 181k after we lost a large customer" in an emailThe modelA figure in a sentence can only be found by reading the sentence
A procedureWhat a memo contains, in what order, with what rulesA skill the model followsIt is long, needed only for one kind of task, and each firm wants its own

Most real tasks are a mix, and the design work is cutting them at the right place. Recording a founder's update is reading (the model finds the figures) followed by a comparison (code says what fell). A pack for the partners is a procedure (the skill) that begins by calling a comparison (the review) and must not redo it.

Definitions

A pipeline is the set of deals a firm is considering, each at a stage (first contact, diligence, a decision, invested, passed). Pre-money is what a company is valued at before new money comes in; post-money is that plus the new money. Dilution is the fall in a holder's share when new shares are issued. A SAFE or convertible note is money put in earlier that turns into shares at the next round, on terms set by a cap (a ceiling on the valuation it converts at) or a discount. Pro rata is an existing investor's right to buy enough of a new round to hold their share. Burn is cash spent per month; runway is cash divided by burn, in months.

24.3The pipeline review, by code

The review answers five questions: what is open, what is new, what has gone quiet, what is overdue, and who is owed a reply. Every one is a comparison of dates. No model is called.

Finding the pipeline without naming it

A firm's database has its own objects, lists and stage names, and they change. Code that said "read the deals object and treat Passed as closed" would work for one firm on one day. The review reads the layout the program already keeps (Chapter 21) and takes a pipeline to be any object or list that has a stage field. The database calls that field's type "status", and that type is the only thing the code looks for.

stage = next((a for a in attrs if a.get("type") == "status" and a.get("api_slug")), None)
if stage is None:
    continue

The rest is found the same way. A deadline is a date field whose name says so (due, next, follow, deadline, again, remind), which leaves out the date of a first meeting. A next step is a text field with "next" in its name. Whether a stage is closed cannot be read from the layout, because the database gives a stage a title and an order and nothing else. So a stage is closed if its name says so (won, lost, passed, invested, declined and a few more), and every review prints the stages it took as closed. A wrong guess is then seen, and one sentence from the owner corrects it for good.

A guess the owner can see

A rule that reads meaning from names will be wrong for some firm. The remedy is to print what the rule decided, every time, next to the result it affects, and to give the owner a cheap way to overrule it. A guess that is hidden is a fault waiting to be found; a guess that is printed is a default.

Gone quiet, overdue, owed

QuestionHow code answers itWhat it reads
Gone quietAn open entry whose company and people the firm has not dealt with for three weeks, with no meeting ahead. If the firm has never dealt with them, the day the entry was made is used, and the review says soThe database's own record of the last and next email or meeting with each linked company and person
OverdueA deadline field on an open entry with a past date; any open task past its deadlineThe entry; the database's tasks
Owed a replyA person on an open entry whose latest email to the owner is newer than the owner's latest email to them, and more than a day oldTwo mail searches for every twenty people, made by code: one of the inbox, one of sent mail
NewEntries made in the last seven daysThe entry

"Last dealt with" is bought, not built: the database works it out from the mail and calendars its members have synced. The review reads that field and does not count emails itself.

Three faults the first live run showed

The unit tests passed against text written by hand to look like the database's answers. The first run against a real database then failed in three places, none of which a hand-written answer would have had.

What the real answer didWhat went wrongWhat now holds
Records fetched by id come back as a list with no nameThe code asked for a list called "records" and found none, so no company's last contact and no person's address was read. The review still looked completeThe nameless list is read; the test's stand-in answers in the same shape
Tasks are given ten at a time and no moreAsking for fifty was refused. The review said tasks could not be read, which was true and unhelpfulTasks are read ten at a time
A date is written as 03/11 with nothing to say which is the dayNothing yet, but one reading is eight months offThe order is read off the values: a number above twelve settles it; failing that, a "last dealt with" date that would lie in the future one way round is the other way round

The first of these is the dangerous kind. Nothing failed. A review with no company gone quiet is a normal review, and only the count of mail searches in the script's output (zero, when there were people to check) gave it away. A live check that prints counts of what was read, as well as what was concluded, is what caught it.

The message and the file

The review is one message short enough for a phone, with at most twelve lines of each kind, and one PDF that carries everything. The PDF is a web page written by this program from a fixed layout and printed by the browser on the rented machine (Chapter 15). Every word that came from the database is escaped before it goes into the page, since a company's name is something a stranger chose. The model takes no part: the page is not designed afresh each week, so there is nothing for it to do.

It is sent by itself on one morning a week, once, and it is also a tool. The owner can ask for it at any time; a routine can call it; the pack for the partners starts from it. Where the model is given the review, it arrives marked as material, because the names and next steps in it were filed from what other people wrote.

24.4What companies report, kept as numbers

A founder's update is prose. Reading it is the model's work. Everything after the reading is code.

portfolio_record(company="Corvid Freight", period="2026-10",
                 figures={"revenue": 181000, "cash": 1200000, "burn": 260000, "headcount": 21},
                 currency="USD")

The tool accepts a company, a period (a month or a quarter: the period the figures are for, not the day the email came), and numbers under a short fixed list of names: revenue, recurring revenue by month or year, value passed through, burn, cash, runway, headcount, customers, gross margin. A name outside the list is refused. A figure given as text ("1.2m") is refused. A period that ends more than 31 days after the day of recording is refused; the month in progress passes. The model is told to pass only numbers the update states, and not to work one out, convert a currency or carry one forward.

Why only numbers

The update was written by someone outside the firm, and the notebook is read back in later conversations. If a sentence from the update were kept, it would be a way for a stranger's email to place words in front of the model weeks later (Chapter 9). A number under a fixed name cannot carry an instruction. Three short strings are kept besides: the company's name, cut to sixty characters with everything but letters, digits and a few marks removed, and shown back marked as material; a currency of at most four characters; and the sender's mail domain, which code uses to recognise the next update and does not show to the model.

Against the period before, code points out: revenue, customers or headcount that fell by a twentieth or more; burn that rose by a quarter or more; cash that fell by more than the stated burn accounts for; runway under nine months, as the company states it or as cash divided by burn, and it says which; and a company whose latest figures are more than a period overdue. A month is compared with a month and a quarter with a quarter. Each figure recorded is shown to the owner by code under the reply, so that a misread number is seen on the day it is kept.

The check on cash was added after the first run in the real chat. The model, given two months of made-up figures, noticed by itself that cash had fallen by 700 thousand against a burn of 260 thousand, and said so. The observation was right and useful, and it was arithmetic done by a model: it would be made some weeks and not others. It is now a rule in code, made every time.

Finding the updates

Each morning code searches the last days of the inbox for mail whose sender's domain belongs to a company the firm holds and whose subject reads like an update. The domains come from two places: any list in the database with "portfolio" in its name, and the senders of updates already recorded. Each message found is handed to the assistant as an ordinary task, once, with the email named as material that other people wrote. Finding costs nothing; the model runs only when there is an update to read. An update the owner forwards or pastes is recorded in the same way.

Nothing is written to the firm's database by any of this. The figures live in the assistant's own notebook. If the database has fields for runway or the date of the last update, filling them is a change to the firm's record and goes through the gate like any other.

24.5Round maths: a calculator, with its conventions

A language model asked what a round does to ownership will produce figures. They are right often enough to be trusted and wrong often enough to matter, and nothing in the reply tells the two apart. So the model's part is to read the numbers off the term sheet or the message and hand them over. The sums are done by one function, the same way every time.

The function needs conventions, because a term sheet can be read more than one way, and it states them under every answer:

TermHow it is taken
Pre-money valuationCovers the shares in issue, the notes and SAFEs once converted, and any top-up of the option pool. Conversion and the top-up therefore dilute the existing holders and not the new money. This is the usual reading
A post-money SAFE with a capConverts into its amount divided by its cap, as a share of the company after all notes have converted and before the pool top-up and the new money
A pre-money SAFE or a note with a capConverts at the cap divided by the shares in issue before any conversion
A discountConverts at the round's price less the discount; with a cap as well, whichever gives more shares. A cap above the round's own valuation does nothing
The option poolTopped up before the round to the stated share of the company after it

These depend on each other. The price depends on how many shares the notes become; a post-money SAFE's share count depends on the total after conversion; the pool's size depends on the total after the round. The function starts from the cap table as it stands and repeats the three calculations until nothing moves. If they never settle (notes and a pool that between them claim the whole company), it refuses and says so; it does not return the last figures it reached.

It also says what it does not handle: liquidation preferences, participation, anti-dilution, interest on a note, warrants. The model is told to report that line with the figures, and to say so to the owner if the term sheet uses another convention, never to adjust the result.

A worked example

A made-up round, put to the assistant in one sentence: a company raises 3 million at 12 million pre-money; there is one post-money SAFE of 500 thousand at a cap of 5 million; the term sheet wants an option pool of 10% after the round; the firm held 8% before. What does it hold after if it puts in nothing, and what does its pro rata cost?

HolderBeforeAfter
Everyone holding shares before100%63%
The SAFE7% (10% at its cap, then diluted by the pool top-up and the new money)
Option pool10%
New money20%
The firm, putting in nothing8%5.04%

The pro rata costs 189 thousand: 6.3% of the round, which is the firm's holding just before the new money, once the SAFE has converted and the pool is topped up. Holding exactly 8% after the round would take 444 thousand. The two differ because the SAFE and the pool have already diluted the firm before its right is measured, which is the kind of distinction a model's own arithmetic blurs. In the real chat this took one call to the tool, 16 seconds and 7 cents. The model added a currency nobody had named; the tool's description now says not to.

24.6Procedures that come with the program

The rest of the list is procedure: what a memo contains, how a pass is worded, what a pack for the partners holds, what a data room at a given stage should have. Chapter 5 describes skills, which are procedures the owner teaches in a message. Four now come with the program, in the same format and the same folder layout, read by the same tool:

SkillWhat it fixesWhat it leaves to the owner
Investment memoThe order of gathering (the record, the deck, the call notes, then the web); ten sections that stay in even when empty; a source in brackets after every fact; ownership figures from the calculatorThe recommendation, left as a heading with an empty box
Note to a founderA pass that says so in the first three lines; a follow-up listing what each side promised; the owner's voice learned from their own sent mailThe reason for a pass. If the owner gave none, none is written, and the owner is told it was left out
Pack for the partnersStarts from the review and does not recount it; one paragraph on each new deal; what needs chasingEvery decision. The model's two sentences on a deal are headed "My take" and are never the firm's view
Data roomRead everything first; a list of what a room at each stage normally holds; every place where two files, or a file and the deck, disagreeWhat to do about it. It says once that it is a first reading, not legal or accounting advice

Three rules govern how they sit beside the owner's own:

  • The owner's wins. A skill taught under the same name stands in front of the one that came with the program. Nothing is merged. Deleting the owner's brings the program's back.
  • It can be turned off. Removing one that came with the program records its name in a small file in the owner's folder; the program's own files are never written.
  • It is labelled. The list the model sees marks each as having come with the program, and its body arrives under a line saying the owner has not taught their own and that if they say how they want it done, that should be saved under the same name.

The reason to ship them as skills and not as instructions in the standing prompt is cost and ownership. A standing prompt is paid for on every message; a skill costs one line until a task fits it. And a firm's memo format is the firm's: the mechanism by which the owner replaces it should be the ordinary one.

Like any skill, these permit nothing. A note to a founder is still put to the owner before it is sent (Chapter 8).

24.7The theory

The sorting rule. A model M is a random function (Definition 1), so anything it computes has a distribution, and a question with one right answer is answered right with some probability below one. The chapter's rule, for each step of a task: if the step's correct output is a function of structured values that can be written down (dates, sums, a stage's name), it goes to code, which gives the same answer every time at no model cost. If an input is prose, such as a founder's sentence, the step needs M. If the step is a long fixed procedure needed by one kind of task, it is text placed in the context when that task comes up: a skill. A real task is cut where its steps change kind, and the cut is a typed interface: the model's output at the cut is checked by code before anything is kept.

The pipeline review is then a pure function of what it reads, as derived state is of the journal in Definition 8, except that its inputs are the database's records, the mail service's dates and the day: the same inputs on the same day give the same review. What remains uncertain is the input: whether the synced mail and calendars are complete, which the review cannot see.

Property: an update leaves at most a short name behind in what the model reads

Whatever an update says and whatever the model makes of it, portfolio_record keeps only numbers under keys from a fixed list, a period in a fixed form, a currency of at most four characters drawn from Latin letters and five currency signs, up to four sender's mail domains that have the form of a domain, and a company name of at most sixty characters drawn from letters, digits, spaces and a few marks. The domains are used by code to recognise later updates and are not shown by portfolio_show. So the text with provenance S that can reach a later context through the notebook is bounded by the name and the currency for each company.

Argument. Every other value is refused by a type check before anything is written, or removed by a filter: a key outside the list, a figure that is not a number, a period that cannot be read, a character outside the name's or the currency's set. The checks are code and do not consult the model.

Where it stops. The bound narrows the channel and does not close it. Sixty letters are enough for a short imperative sentence, which is why the name is shown back marked as material. And a number can mislead without carrying words: a misread figure is kept as faithfully as a right one, and only the line shown to the owner on the day can catch it.

Arithmetic taken from the model. The round calculator solves three equations together: the price is the pre-money divided by all shares before the new money; each note converts at its cap, its discount or the price, whichever gives more shares; and the pool is topped up to its target share of the total after the round. Each depends on the others. The function iterates from the present cap table and returns only when one sweep moves the share counts by less than a ten-millionth of the shares in issue; it refuses if the counts grow without bound or do not settle. So any table it returns satisfies its stated conventions to that tolerance, and there is no case in which it returns figures that do not. What remains to the model is transcription of the inputs, most of which the answer restates.

The worked example can be checked by hand from the conventions. The new money is 3 of 15 million post-money, 20%; the pool is 10%; the SAFE takes 10% of the company before the pool top-up and the new money, so the holders before and the SAFE share the remaining 70% as 63% and 7%. The firm keeps 8% of 63%, which is 5.04%, and just before the new money it holds 5.04/80 of the company, 6.3%, so its pro rata is 6.3% of 3 million, 189 thousand. The 7% needs the SAFE measured before the pool top-up as well as the new money, as the code states it.

Claim in this chapterKindHow it is known
The review is the same for the same database, mail and dayPropertyNo model call; unit tests on a stand-in database
An update can leave only numbers, a short name, a currency and the sender's domainPropertyArgued from the type checks; tests of what is refused
A calculator answer satisfies its conventions, or there is nonePropertyArgued from the loop's exit; tests against rounds worked by hand
The model reads the right figures from an updateMeasurementTwo made-up months recorded once in the real chat
The review finds what has gone quiet in a real pipelineMeasurementOne run on three open entries with no addresses

24.8What goes wrong

A review that is quietly empty

Described above: a read that returns nothing looks the same as a pipeline in good order. The defence is a live check that prints how much was read, and a review that names what it could not read (mail not connected, tasks refused) at its foot.

Meaning read from names

Closed stages and deadline fields are found by their names. A firm that calls its last stage "Graduated" will see closed deals counted as open until it says so once. The review prints what it assumed.

Stale by the wrong clock

"Last dealt with" is only as good as the mail and calendars synced to the database. A partner who has not connected theirs makes every one of their deals look quiet. The review cannot tell; it reports the field as it is.

A figure for the wrong period

An update sent in November is about October. The tool asks for the period the figures are for and refuses one that ends more than 31 days ahead, but it cannot catch a model that files October's figures under November. The line code prints under the reply, naming the company and the period, is the owner's chance to see it.

A convention the term sheet does not share

If a term sheet puts the pool top-up after the round, the calculator's answer is wrong for that term sheet and right for its stated convention. It says which convention it used every time; it cannot read the term sheet.

24.9How to test it

The calculator is tested against rounds worked by hand: a plain round, a post-money SAFE at its cap, a cap above the round, a discounted note, a pool top-up, and the two costs of keeping a share. The notebook is tested on what it refuses as much as on what it keeps. The review is tested against a stand-in database that answers in the real one's text format, with five made-up deals chosen so that each rule has one case that fires and one that nearly does: quiet with a meeting booked, written to but answered, written to an hour ago.

Verified, live: the review against a real database and mailbox, once, in 14 seconds with no model call; its PDF printed in 12 seconds for a twentieth of a cent; sent by itself on its morning. In the real chat, on made-up numbers: the worked round above; a question about the pipeline answered from the review in 7 seconds for under a cent; two months of a made-up company's figures recorded in 5 seconds for just over a cent, with the fall in revenue and headcount, the rise in burn and the short runway pointed out by code.

Not tested: the review on a pipeline of real size, or with real people on its deals (the database it ran against held three open entries and no addresses, so "owed a reply" made no mail search and has only its unit test). No real update has been found in the inbox by the morning search. None of the four procedures has been followed in the real chat. Nothing here has been used through a working week.

24.10Where this sits in the literature

The practitioner baseline for this chapter is [Anthropic 2024a], which separates fixed workflows, in which code decides the sequence of steps, from agents, in which a model does, and recommends the simplest structure that works. This chapter agrees and goes one step further for its comparisons: the simplest structure for a question with one right answer about dates is no model at all. In the review, the checks on figures and the calculator, the model appears at most at one end, reading.

[Sumers et al. 2023] give a vocabulary for the parts of a language agent: working memory, long-term memories of several kinds, an action space and a decision procedure. In their terms the notebook of figures is a long-term store with a fixed schema, and the skills are procedural memory held as text. The framework is descriptive. It does not say which steps should be taken out of the model's hands, which is the decision this chapter is about.

Procedural memory can also be code. In [Wang et al. 2023c] an agent writes its own skills as programs, checks them by running them, and keeps the ones that work in a library it reuses. That is stronger than this program in one respect: a skill there is tested by execution before it is kept, while the four procedures shipped here are prose that has not yet been followed once in the real chat. It differs in another: the comparisons here were written and tested by people, and the owner, not the agent, decides what a memo contains.

Giving arithmetic to a tool has a long line in this literature. [Schick et al. 2023] trained a model to decide for itself when to call external tools, a calculator among them. [Wei et al. 2022] showed that writing out intermediate steps improves a large model's arithmetic. Both make the model better at sums; neither makes it certain. The calculator here removes the sum from the model entirely, and keeps for the model only the decision to call it and the transcription of inputs. The chapter's own example shows the residue: the one fault in the live run was a currency the model added, outside the calculation.

Finding the pipeline by the type of a field, and not by the names of objects and stages, is the advice of [Parnas 1972]: cut modules around the decisions likely to change, so that a change touches one place. Here the decision likely to change is each firm's layout, and it is read, not written into the code. The one decision that cannot be read, which stages are closed, is guessed and printed, so that the hidden assumption becomes a visible default.

The review that was quietly empty is a small instance of what [Sculley et al. 2015] catalogue for systems built around models: the cost lies in the surrounding code, in glue between components and in failures that produce plausible output rather than errors. The defence used here, printing counts of what was read beside what was concluded, is the kind of monitoring their account calls for.

Set against all of this is [Sutton 2019]: over the long run, general methods that use more computation have beaten hand-built knowledge. Every rule in this chapter is hand-built. The tension is real and not settled. One reading is that these rules encode definitions (what a post-money SAFE converts into) rather than knowledge a model could learn better, so the lesson does not reach them; another is that the line between code and model should move as models improve, and that a program should record where it was drawn and why, so that it can be moved. Which reading is right, and how to tell when a rule should be handed back to a model, is open.

Summary
  • Sort recurring work by what it is made of: comparisons go to code, reading to the model, procedures to skills. Most tasks are a mix, and the design is where to cut.
  • A pipeline is any object or list with a stage field, found from the layout. Closed stages and deadline fields are found by name, and the review prints what it assumed.
  • The review is one message and one PDF, made with no model call, sent once a week and available as a tool.
  • Companies' figures are kept as numbers under fixed names. That keeps a stranger's sentences out of a notebook the model reads later.
  • When the model does useful arithmetic unasked, move it into code, so that it is done every time.
  • The round calculator states its conventions and what it does not handle under every answer, and refuses numbers that do not settle.
  • Procedures shipped with a program use the same form as the owner's own, are labelled, can be turned off, and lose to the owner's.
  • A check against hand-written answers passes where the real service's answers differ. Print counts of what was read.
Problems

Review

  1. For each of these, say which of the three kinds of work it is and where you would cut it: preparing a list of co-investors to call; checking that a cap table adds up; writing the quarterly letter to the fund's own backers.
  2. The rule for a closed stage reads names. Propose a second source of evidence in the database itself (for example, how long entries stay in a stage) and say what it would get wrong.
  3. "Owed a reply" compares the latest inbound and outbound message for each address. Give two cases where it is wrong (one false alarm, one miss) and a change that fixes one of them without a model.
  4. Add "net revenue retention" to the notebook. Decide its name, its unit, and whether a fall should be pointed out. What did you have to decide that the existing metrics had already settled?
  5. Extend the calculator to a term sheet whose pool top-up comes after the round. Work the example above by hand under that convention first, and write the test from your figures.
  6. The owner teaches a memo format of their own and later deletes it. Trace which skill the model reads at each step, and what the owner is told.

Analysis

  1. Under the calculator's conventions, suppose the only convertibles are post-money SAFEs whose amounts divided by their caps sum to F, the pool target is t and the new money buys a share n of the company after the round, with no pool before. (a) Show that the holders before the round end with (1 โˆ’ t โˆ’ n)(1 โˆ’ F) of the company, and check it against the worked example. (b) State the conditions on F, t and n under which no cap table satisfies the conventions, and say which branch of the calculator's loop then ends it. (c) Name a hypothesis of (a) that a real round can break, and say which line of the formula it changes.
  2. A made-up company raises 2 million at 6 million pre-money. It has one post-money SAFE of 500 thousand at a cap of 5 million, the term sheet wants a pool of 10% after the round, there is no pool before, and the firm held 12% before. (a) Using the calculator's conventions, give the share after the round of the new money, the pool, the SAFE, the holders before, and the firm if it puts in nothing. (b) Give the cost of the firm's pro rata and the cost of holding exactly 12% after the round. (c) Now measure the SAFE's share after the pool top-up instead of before it, all else equal, and give the firm's share after the round. What does the difference show about stating conventions?
  3. Prove the property "an update leaves at most a short name behind in what the model reads" from the code's checks as the chapter describes them. Then show that the character filter does not exclude a short imperative sentence, and use Property 2 to state what such a sentence could cause without a question when it is later read in a conversation. Is the property worth having, given that?
  4. The review decides whether a date written "03/11" puts the day or the month first. (a) If the days of the month in a database's dates were spread evenly over 1 to 30, what is the probability that none of k dates has a day above twelve? Give it for k = 3, and the smallest k that brings it below 1%. (b) Construct a small set of dates on which neither of the two tests decides the order, and say what the review should do then.

Design

  1. The partners ask the review to flag deals "at risk", judged from the tone of the founder's last email. Cut the task: say which step is a comparison, which is reading, and where the model's output enters a review that until now had no model in it. State what the review still guarantees afterwards and what it gives up, including whether two runs on the same day still agree.
  2. A rival product answers questions about rounds by having its model write and run a short program each time, in a sandbox. Compare it with the fixed calculator: what each guarantees about the answer, which can state its conventions, which handles a term the other cannot, and what each costs per question. Say which you would ship for this firm and what evidence would change your mind.

Reading

  1. [Anthropic 2024a]. In about four hundred words: what it claims about workflows, agents and choosing the simplest structure; why it matters for the decision to build the pipeline review with no model call; where you were not convinced that its patterns cover a step with one right answer; and what you would measure next to show that the review's design was the right one for this firm.
  2. [Sumers et al. 2023]. In about four hundred words: what the framework claims about the parts of a language agent; why it matters for placing the notebook, the skills and the calculator; where you were not convinced the framework helps decide what to take away from the model; and what you would build next to test one prediction you can derive from it about this program.

Open

  1. (Hard, open.) The cash check moved an observation from the model into code. Design a way to find such observations systematically: what would you log, and how would you decide that one had recurred often enough to become a rule?
  2. When should a rule written in code be handed back to a model? Propose a criterion that uses only measurable quantities (the rule's error rate on real inputs, the model's error rate on the same inputs with an interval, and the cost of each) and say how it would be applied to the rule for closed stages. Progress would be a criterion that, applied to rules in this program, makes a prediction a later measurement could refute.